Application NK/2024/0460
Field Name | Details |
---|---|
Applicant Name | Alistructures Ltd |
Location | The Hermitage, Desborough Road, Brampton Ash, LE16 8GP |
Ward | |
Parish | |
Proposal | NK/2021/0306 (Redevelop eastern half of business park to provide new employment units (Class E-formerly B1)): 1. The building location has changed but is located in the original redline boundary. 2. Planting inside the courtyard has been removed. 3. Cycle store position moved to form one cycle location. 4. Ground material finishes revised. Addagrip and granite sette removed. 5. Canopy removed to unit one. 6. All perimeter fencing has been removed to the boundary and internal parts of the site. 7. Parking spaces relocated. 8. EV parking spaces relocated. 9. EV parking chargers have been relocated to the building facade. 10. Relocation of personnel doors and roller shutter doors/windows. 11. Motorbike spaces repositioned. 12. Path along the south boundary route surface finish changing from MOT to bark chippings. 13. Building units changed from 8 units to 9 units. Unit sizes have changed due to the number of units. 14. Rooflights added back in. 15. solar panels removed. 16. Rear personal doors to units removed. 17. Some windows to elevations have been removed. 18. Location of timber cladding added to elevation 4. 8. 19. There are now two types of external cladding PIR wall panels and have been outlined in the drawings. There is a Trapezoidal panel located behind the timber cladding. 20. Canopy removed from elevation 6 11. Additional external lighting is incorporated into the elevations. 21. Increase in eaves and ridge height |
Application Type | Non-Material Amendment |
Case officer | Alan Chapman 01536 807000 |
Decision level description | Delegated |
Event | Date |
---|---|
Date received | 01/08/2024 |
Validation/registration date | 01/08/2024 |
Statutory expiry date | 29/08/2024 |
Target Decision Date | 29/08/2024 |
Decided on | 29/08/2024 |
Decision | Approved |