Condition nos. 6 (Construction environmental management plan - biodiversity), 7 (Finished floor level plans), 8 (Ecological verification report), 10 (Surface water drainage strategy) and 11 (Surface water drainage system maintenance and upkeep scheme) of NK/2022/0613